Rooftop solar array on an industrial building in Sonora, built by PSE
Industrial systems

Industrial solar for heavy industry and agribusiness

Turnkey industrial solar in northern Mexico, from 50 kWp to several MW: engineering, balance-of-plant electrical work, maintenance, and interconnection with CFE, Mexico's state-owned electric utility.

Problems we know

What your plant is dealing with today

A CFE bill that keeps climbing

CFE's industrial rates rise year after year: GDMTO, the ordinary (non-time-of-use) medium-voltage rate, and GDMTH, the time-of-use rate for medium-voltage customers with high demand. Electricity is the third-largest operating expense, after payroll and raw materials.

A congested CFE grid

Voltage sags, momentary outages, voltage spikes and poor power quality during peak hours are damaging your critical equipment.

Environmental audits

Customers in the EU and the United States already ask for CBAM (Carbon Border Adjustment) documentation, measurable Scope 2 and certified renewable energy. Without the paperwork, contracts are lost. A grid-connected solar system generates CELs (Mexico's Clean Energy Certificates) and automatic ESG reporting.

Capital tied up in an expense

Every peso paid to CFE is a peso you cannot invest in growth, equipment or people.

How we solve it

Tangible benefits for your industrial operation

Accelerated tax deduction

Solar qualifies for accelerated deduction in the first fiscal year, which improves cash flow and lowers income tax (ISR).

Payback in 3 to 5 years

After payback, 25+ more years of generation at no cost. The project pays for itself out of the monthly savings.

Full regulatory compliance

We comply with NOM-001-SEDE (Mexico's electrical installation standard), CFE's rules for interconnection to the national grid and every provision that applies, so interconnection brings no surprises.

PPA (power purchase agreement) options

Panels installed with no upfront investment. You pay only for the energy generated, under a long-term contract.

24-hour response instead of 4 to 8 weeks

When an inverter fails and your installer is not an authorized service center, your plant waits 4 to 8 weeks while the unit is shipped to China. As the only GOODWE Authorized Service Center in Sonora, we handle it directly: diagnosis within 24 hours, replacement on site. An idle inverter is an idle solar plant, and that is not an option in an industrial operation.

Monitoring and data

Every kWh, measured and in plain view

Every PSE system delivers real-time telemetry: generation, self-consumption, surplus and alerts. You see the numbers; we watch the performance.

INDUSTRIAL PROJECT · 494 kWp · MIGUEL ALEMÁN, SONORA

841,281kWh generated

OPERATING SINCE APR 2025
06:0009:0012:0015:0018:00TYPICAL PEAK≈ 395 kW
Yield1,628 kWh/kWp·yr
CO₂ avoided366 t
Panels784
Cumulative savingsMXN 3.03M

Cumulative data as of June 2026 from a PSE industrial project in Miguel Alemán, Sonora, taken from its monitoring portal. The daily curve is schematic. Every client gets access to their own portal.

Sectors we serve

We work with demanding industries

Since 2024 we have delivered projects in sectors with strict requirements for operational continuity and regulatory compliance.

See completed projects
  • Agribusiness (poultry, hog, dairy)
  • Light and heavy manufacturing
  • Warehouses and distribution centers
  • Food processing plants
  • Treatment plants
  • Small-scale mining
  • Packing and packaging
  • Cold storage and refrigerated rooms
Our process

Four steps. No surprises.

  1. 01

    Technical assessment

    We review your CFE bills, load profile, available space and site constraints. No obligation.

  2. 02

    Proposal and sizing

    We design the right system for your operation, with a generation simulation, projected ROI and financing options.

  3. 03

    Turnkey execution

    Supply, electrical work, installation, testing, the CFE filing and interconnection. We coordinate all of it in-house.

  4. 04

    Monitoring and warranty

    Remote monitoring, maintenance by LIMSON, our group's panel cleaning and maintenance company, and direct technical support from our GOODWE Authorized Service Center.

Send us your CFE bill. We'll tell you what you can save.

A proposal with real numbers in 5 business days, not brochure estimates.

No cost, no obligation.

Frequently asked questions: industrial systems

How much does an industrial plant invest in a solar system?

For industrial systems from 50 kWp to several MW, the typical range is MXN 18 to 22 per watt-peak installed, turnkey, depending on the technology, the type of structure (rooftop, ground mount or canopy), the electrical distance to the point of interconnection and the total size. An average 250 kWp industrial project runs MXN 4.5 to 5.5 million before VAT. The exact figure depends on the technical assessment of the site and on the financing option you choose: cash purchase, loan or PPA.

Does my GDMTH rate stay the same after going solar?

Yes. Your CFE rate depends on your voltage level and contracted demand pattern, not on whether you have panels. Under the exempt distributed generation category (up to 500 kW) or the small-producer category (up to 1 MW), the plant stays connected on its original GDMTH rate and the system reduces the energy charge. The peak-hour demand charge goes down only if solar is combined with storage or if the generation profile matches your contracted demand curve. We calculate both effects in the design.

What is a PPA, and when does it make sense for my plant?

A PPA (power purchase agreement) is an arrangement in which a third party finances, installs and operates the solar system at your site, and the plant pays only for the energy generated, at a per-kWh rate lower than CFE's. There is no upfront investment. It makes sense when you need to free up capital for growth, when you cannot use the tax deduction, or when you prefer to move the cost to operating expense without touching the balance sheet. For a PPA to be financeable, consumption must be above 350,000 kWh per year and there must be a stable lease or ownership of the property.

How long does CFE interconnection take for an industrial project?

For systems in the exempt distributed generation category (up to 500 kW), the CFE process typically takes 6 to 10 weeks: application, technical ruling, signing the interconnection contract and the change to a bidirectional meter. For small-producer systems (500 kW to 1 MW) the process is longer, 4 to 6 months, because it requires a grid impact study. PSE manages the entire filing: engineering, the application package, follow-up with CFE and coordination of the meter change.

What happens to power factor after installing solar?

Modern PV inverters operate at a power factor close to unity. But when solar reduces the active energy you draw from the grid, the reactive energy of your inductive loads does not change, so the net power factor that CFE measures can get worse. If your plant already runs at a low power factor, a solar installation can increase the penalty unless it is compensated. Our industrial designs always include a post-installation power factor analysis and, where it applies, a corrective capacitor bank. It is part of the deliverable, not a surprise extra cost.

Does the 100% deduction under Mexico's Income Tax Law (LISR) apply to my solar project?

Yes. Article 34, section XIII of the Mexican Income Tax Law (LISR) allows a 100% deduction of the amount invested in renewable generation equipment in the fiscal year in which the investment is made, provided the asset stays in operation for at least 5 years. It applies to companies and to sole proprietors. To use the benefit, the invoice must cover equipment, installation and engineering that are separable from the building. Our invoices and technical package are prepared to support the deduction in the event of a review by SAT, Mexico's tax authority.

Why does a GOODWE Authorized Service Center matter for industry?

In an industrial operation, a stopped inverter means a plant generating at only half its capacity. When the installer is not an authorized service center, a GOODWE warranty replacement goes through the importer, and the unit is shipped to China for diagnosis and back: a wait of 4 to 8 weeks. As the only GOODWE Authorized Service Center in Sonora, we handle it directly: diagnosis within 24 hours, replacement from on-site inventory and warranty closure with no intermediaries. For an industrial plant, that difference is worth more than the price of the project.

Next step

We take your project from the first idea to the first kWh

Schedule a no-cost technical site visit. Get a tailored proposal in 5 business days.

WhatsApp Call Proposal
WhatsApp Request a proposal →