Energy storage · BESS

Battery energy storage (BESS) for plants and businesses in Sonora

A BESS charges in the off-peak block and discharges at peak to lower the demand CFE bills in the capacity charge. We design, size and integrate these systems, starting from your bills and your load curve, not from a catalog.

What it does

What a BESS does at a plant on the GDMTH rate

A BESS (battery energy storage system) is a bank of lithium cells with a bidirectional converter and a control system that decides when to charge and when to discharge. This page is about plants billed by CFE, Mexico's state-owned electric utility, on GDMTH, CFE's time-of-use rate for medium-voltage customers with high demand.

On that rate a BESS can do two jobs. One is to lower the demand billed in the capacity charge (cargo por capacidad), the per-kW charge on a CFE bill that most people call the demand charge. The other, if the system is designed for it, is to back up critical loads. We design, size and integrate systems for both.

It charges in the base period

On weekdays the base period (the off-peak block) runs from midnight to 6 a.m. Energy there costs MXN 0.9408 per kWh (October 2026, GDMTH, Northwest Division), and that is when the battery fills up.

It discharges in the peak period

A BESS discharges in the peak period (horario de punta), the hours CFE sets by region and season when energy costs the most and the demand for the capacity charge is measured. In Hermosillo and CFE's Northwest Division that is 8 p.m. to 10 p.m. on weekdays in summer; in winter, 6 p.m. to 10 p.m. on weekdays and 7 p.m. to 9 p.m. on Saturdays. By then there is no useful solar generation: almost all of the peak period falls after sunset.

It can lower the demand CFE bills

CFE takes the highest 15-minute interval of all the peak periods in the month. Each kW the battery shaves and holds through every peak period of the month is worth that month's capacity rate (MXN 377.17 per kW in October 2026), as long as what you are billed on is your peak demand and not the cap set by the formula.

See how the formula works

Rates published by CFE for GDMTH, Northwest Division, October 2026, in Mexican pesos before VAT, as consulted on October 8, 2026. CFE adjusts them every month and they vary by division.

The rule

How CFE bills capacity on GDMTH

The capacity charge is what CFE bills on the GDMTH rate for each kilowatt of billable demand, and that demand is the lesser of two values: your maximum demand in the month's peak period, or your consumption for the month divided by 24 × days × 0.57.

Billable demand for capacity = min { Dmax, peak ; Qmonth ÷ (24 × d × LF) }

Dmax, peak Maximum demand in the peak period
The highest 15-minute interval within the month's peak periods, in kW. On your bill: the maximum demand in the peak period.
Qmonth Consumption for the month
All the kWh you bought in the period: base, intermediate and peak added together. On your bill: the kWh of each period.
d Days in the period
The days the bill covers. On your bill: the dates of the billing period.
LF Load factor
Set by the rate: 0.57 for GDMTH (Agreement A/158/2024, Sole Annex, Table 2). It does not appear on the bill.
  • Demand is measured in 15-minute intervals, any fraction of a kilowatt counts as a full kilowatt, and each month is billed on its own demand (GDMTH rate, section 7.3). One high interval inside the peak period sets that month's capacity demand; it does not carry over to the following months.
  • The distribution charge uses the same formula, but with the maximum demand of the whole month instead of the peak-period maximum.
  • If a rate has no peak period, or the service has no demand metering, only the second term applies.
  • Contracted demand is set by you when you contract the service and is not in the formula (GDMTH rate, section 4): CFE bills the measured demand or the cap, not the contracted figure. With a battery it does matter: its power counts within your contracted demand and the recharge cannot exceed it (provisions of the CNE, Mexico's National Energy Commission, published in the Official Gazette, DOF, on April 16, 2026; section 4.2).

Which of the two values you are billed on

Your peak sets the charge

A two-shift plant: 460 kW of maximum demand in the peak period against 590 kW from the second term. The peak is billed, and every kW shaved counts.

Your consumption sets the charge

A business with an evening peak: 600 kW in the peak period against 369 kW from the second term. The cap is billed: shaving from 600 to 369 kW changes nothing.

Both are hypothetical plants from this page's worked example.

Dividing by 0.57 is the same as multiplying your average demand by 1.75: your peak sets the charge as long as your demand in the peak period is below 1.75 times your average demand.

What solar does: it lowers your consumption for the month and, with it, the second term, which only lowers the charge if that term is the one you are billed on. It does not lower demand in the peak period, which falls almost entirely after sunset.

Check it with your own bill: capacity charge calculator (in Spanish)

The peak period in Hermosillo and CFE's Northwest Division

  • Summer rate season (in 2026, April 5 to October 24): weekdays, 8 p.m. to 10 p.m.
  • Winter rate season (in 2026, before April 5 and from October 25): weekdays, 6 p.m. to 10 p.m.; Saturdays, 7 p.m. to 9 p.m.
  • Sundays and public holidays have no peak period.
  • In 2026 that adds up to 776 peak hours, 8.9% of the year.
  • Sonora does not change its clocks during the year and keeps the same time as Arizona: these are clock hours in any month.
  • San Luis Río Colorado, Puerto Peñasco and General Plutarco Elías Calles are in CFE's Baja California Division, on a different schedule: there the summer peak period runs from 2 p.m. to 6 p.m. on weekdays and there is no peak period in winter.

Official sources (in Spanish), consulted on October 8, 2026: CFE, GDMTH rateAgreement A/158/2024, Sole AnnexCNE storage provisions, April 16, 2026

A worked example

One month on GDMTH, with and without a battery

An illustrative example with a hypothetical plant and the rates CFE published for GDMTH, Northwest Division (September 2026). It is not a quote.

  1. Without a battery. The two-shift plant reaches its maximum of the month, 520 kW, at 3 p.m.; its highest demand in the peak period is 460 kW. The second term of the formula gives 590 kW, so CFE bills 460 kW × MXN 377.17 = MXN 173,498.20 of capacity charge: 30.9% of a subtotal of MXN 561,882.30.
  2. With a battery: 150 kW and 300 kWh of usable energy, spreading its discharge across the whole peak period. Demand in the peak period drops to 310 kW and the capacity charge to MXN 116,922.70. Peak energy goes down; base energy goes up with the overnight recharge, because the battery takes more from the grid than it gives back (round-trip efficiency of 85%, NREL Annual Technology Baseline 2025). The distribution charge does not move: the maximum of the month is still the one at 3 p.m.
  3. Gross saving on the bill: MXN 59,861.95 in September 2026, when the peak period lasts two hours. With the same battery in March 2026, when it lasts four, it is MXN 39,799.02.
  4. One single day without the battery in September 2026 leaves the saving at MXN 3,130.49: that day sets the demand for the whole month.

It is a gross saving on the bill: it does not deduct the investment, the operation or the replacement. It is not a net saving, and your plant will have a different number.

How much the capacity charge weighs on the bill

Calculated with the rates CFE publishes, in this page's example plants, which are hypothetical, the capacity charge is 30.9% and 31.6% of the bill subtotal (two shifts, September 2026 and March 2026), 26.6% (a flat load around the clock) and 9.1% (a single day shift).

Beyond those examples, PSE management's estimate, dated October 8, 2026, is that at GDMTH plants that operate during the peak period the capacity charge can run from 20% to 35% of the bill before VAT. That range is the capacity charge alone: it does not add the distribution charge. If you already have solar panels, the percentage goes up even though the amount is the same, because the energy line gets smaller.

A battery that shaves the peak can lower that charge and lowers peak energy; in exchange, it adds base energy for the recharge.

Who it is for

Which plants in Sonora are a fit for a BESS, and which are not

We also take on projects outside Sonora: for a project of this scale, we travel. The example and the schedules on this page are those of Hermosillo and CFE's Northwest Division; a plant in another division is calculated with the schedules and rates that apply to it.

Where it usually makes sense

  • Your service is on GDMTH: medium voltage with a demand of 100 kW or more.
  • You operate on weekdays during the peak period: two or three shifts, cold storage, continuous-process agribusiness, a maquiladora (export manufacturing plant), a hotel, or a retailer with refrigeration open until 10 p.m.
  • You already have a photovoltaic system and are still paying a high capacity charge.
  • You have loads that cannot tolerate outages. That weighs in because of what downtime costs, not because of the rate.

Not today

  • You run a single day shift and stop before the peak period.
  • Your rate has no peak period. Peak shaving applies to rates that have one, such as GDMTH; on GDMTO, the ordinary (non-time-of-use) medium-voltage rate, and on the low-voltage commercial rates GDBT and PDBT, the rate text bills capacity with the consumption formula, and we confirm it with your bill.
  • The formula already bills you on the cap: shaving the peak does not lower the charge until you cross it.
  • You want to shave the four hours of the winter peak period with a battery bank sized for two.
  • There are cheaper measures you have not taken yet: moving loads out of the peak period, correcting power factor or adding solar panels.
  • Your building is leased and your horizon is short.
  • It is for a home or a low-voltage business: that is a different project, not a plant BESS.

A six-question self-check

Answer yes or no with your latest bill in hand.

  1. Is your rate GDMTH? Screening question
  2. Do you operate on weekdays between 6 p.m. and 10 p.m.? Screening question If you answer no to question 1 or 2, storage is not the answer today; we will tell you what is.
  3. Is the maximum demand in the peak period on your bill lower than your kWh for the month ÷ (24 × days × 0.57)? If it is higher, CFE is already billing you on the formula's cap, and shaving the peak does not lower the charge until you cross it. The calculator does the math for you. Open the capacity charge calculator (in Spanish)
  4. Between 8 p.m. and 10 p.m. (6 p.m. to 10 p.m. in winter), does your plant use about as much power as at midday? In other words, it is not a short spike you could move to another time of day. If you have solar, compare what the plant uses, not what it draws from the grid: at midday the panels cover part of it. A flat peak takes more energy for each kW shaved: two hours in summer and four in winter.
  5. Do you have the space and your own utility service connection?
  6. Does an outage cost you product or production? That counts in favor of backup, not of peak shaving.

Questions 3 to 6: with three or more yes answers, it is worth reviewing. If not, other measures come first; we will tell you either way.

No fine print

What a BESS does not do

A battery charged from the grid does not cut emissions by itself; that is what solar does.

  • It does not lower the distribution charge if it only operates in the peak period, and it can raise it if the overnight recharge coincides with high demand. In this page's example the maximum of the month is at 3 p.m. and does not change; with a flat load, the recharge creates a new maximum.
  • It is not an uninterruptible power supply or a standby generator by default. Backup works only if the equipment can form a grid and there is a critical-loads panel; the energy you reserve for backup is not available for the peak period, and the transfer time is the one on the equipment's data sheet.
  • It does not inject or sell energy to the grid (CNE provisions, DOF of April 16, 2026, sections 4.3 and 4.6.2).
  • It does not shave a peak your rate does not have: on GDMTO, GDBT and PDBT the rate text bills capacity with the consumption formula, and we confirm it with your bill.
  • It does not erase a month: one day without operating sets the demand for that month.
Why PSE

What we bring to a storage project

Bills, load profile and on-site measurement

First we analyze your 12 bills. Later, once the project is well under way, we use CFE's 15-minute load profile if it can be obtained; if not, we install a power analyzer at your plant. On-site measurement is part of our power quality service.

A group with storage and medium-voltage experience

PSE is part of Grupo Empresarial CIAE (GECIAE), a group with more than three decades of history that has worked on battery storage projects in sectors such as electric mobility, hospitality and industry. References are available on request. IED, a sister company: industrial electrical engineering (low, medium and high voltage). CIAE, also part of the group: certified professional training (CONOCER evaluation center).

IED (site in Spanish)

A photovoltaic track record with measured generation

More than 150 photovoltaic projects and 4,060 kWp as of June 2026, with generation measured at the inverter. A BESS is sized on measured load curves, and measuring is part of our everyday work. GOODWE Authorized Service Center in Sonora for photovoltaic inverters.

What procurement asks for to onboard a vendor

REPSE, the federal registry required to provide specialized services to another company in Mexico, and two competency standards from CONOCER, Mexico's national council for labor competency certification: EC1023 (execution and maintenance of electrical installations) and EC0680 (industrial safety supervision). They are credentials of the company and its staff. For storage equipment we work with the leading brands on the market; their certificates come from the manufacturer and are on the list of what to ask any BESS vendor.

Send us your GDMTH bill. We will tell you whether storage makes sense at your plant.

A written review of your capacity charge: which term of the formula CFE is billing you and what we would do first. If your plant is a candidate, we move on to the measurement and the proposal. If storage is not for you, we will say so.

Nothing to upload here: we will write to ask for your latest bill; you send the other eleven later by email or WhatsApp.

The process

What we ask for to evaluate it: 12 bills first; your 15-minute interval data later

  1. 01

    Bills

    The 12 most recent bills for the service: with them we know, month by month, how much capacity weighs and which term of the formula CFE is billing you.

  2. 02

    Written verdict

    Candidate, candidate subject to measurement, or not today, with the reasons and what we would do first even if it is not a battery.

  3. 03

    Measurement

    Once the project is well under way, if the verdict is favorable: the 15-minute interval data from your meter, if CFE provides it; if not, we install a power analyzer at your plant. Ideally we see both seasons, because the peak period lasts 2 hours in summer and 4 in winter; if there is only one, we say so in the result.

  4. 04

    Proposal

    Power, energy, controls, electrical work and permitting, itemized. Once you approve it, integration follows, carried out by PSE: detailed engineering, installation and commissioning.

For procurement

What to ask any BESS vendor (us included)

A list for comparing proposals, including the ones that arrive with no upfront investment. It works just as well if you never call us.

  1. The full calculation, with CFE's official formula and your 12 bills.
  2. The saving split into capacity and energy, and net of investment, maintenance and replacement.
  3. What happens to the saving in a month when the battery fails for one day.
  4. The warranty sheet for the model: years, cycles, end-of-warranty capacity and the temperature the warranty assumes.
  5. The certificates required by the CNE provisions (section 2.12): IEC 62619 and IEC 62933-5-1 and 5-2, or UL 1973 and UL 9540. And the UL 9540A report, which is a test method, not a certificate.
  6. The single-line diagram with the failure mode: if the BESS goes out of service, does the plant stay on CFE without interruption?
  7. Who does the maintenance, and with what response time in writing.
  8. Who files with CENACE, the national grid operator, or with CFE Distribución.
  9. In no-upfront-investment structures: the term, early exit, who owns the equipment at the end and who absorbs a rate change.

Hold our proposal to the same list. Beyond the equipment warranty, a performance guarantee can be offered, depending on the contract.

A different scale

If it is for a home or a low-voltage business

A battery for a home or a low-voltage business provides backup and self-consumption, not peak shaving: it is a different project. We do those too: PSE has installed hybrid and backup systems. Home and low-voltage systems are quoted separately.

Frequently asked questions: energy storage (BESS)

Who designs and integrates the BESS, and how?

We design, size and integrate it, working from your bills and your load curve. PSE is part of Grupo Empresarial CIAE (GECIAE), a group with more than three decades of history that has worked on battery storage projects in sectors such as electric mobility, hospitality and industry. We have more than 150 photovoltaic projects and 4,060 kWp behind us, with measured generation. The method is the same at every plant: first the review of your capacity charge, with your 12 bills; then the 15-minute interval measurement and the proposal, with power, energy, controls, electrical work and permitting. Once you approve it, integration follows, carried out by PSE: detailed engineering, installation and commissioning. If your plant is not a candidate, we tell you so in writing, with the reasons.

How is a BESS different from a home battery?

In scale (hundreds of kWh; the systems we offer go up to 2 MWh), voltage and rules: at a plant, the CNE's regulation treats it as part of the load facility (centro de carga) and it cannot inject into the grid; the control system decides when to charge and when to discharge according to the rate. A battery for a home or a low-voltage business is a different project and is quoted separately.

Do I need solar panels to add a BESS?

No. In Hermosillo almost all of the peak period falls after sunset, so the battery charges from the grid in the base period. If you already have panels or plan to add them, the two are calculated together: solar lowers your consumption and with it the second term of the formula, and that changes how much the battery can shave.

Is a BESS 100% deductible, like solar panels?

It depends on how the battery is integrated into the project. The 100% deduction in the Mexican Income Tax Law (LISR), Article 34, section XIII, is written for renewable energy generation equipment and does not mention batteries. Our working view, reviewed with our group's accountant, is that it can apply when the battery is part of a system with solar generation; we do not take it for granted for a standalone battery. Confirm it with your accountant.

How much will I save, and how long is the payback?

We do not publish a percentage or a payback period: they depend on your 15-minute interval data, on which term CFE bills you and on the cost of the system, which is only known once the engineering is done. In the worked example on this page, with a hypothetical plant and the same battery, the bill goes down MXN 59,861.95 in September 2026 (a 2-hour peak period) and MXN 39,799.02 in March 2026 (a 4-hour peak period); in September 2026, a single day without operating leaves it at MXN 3,130.49. That is a gross saving on the bill: investment, maintenance and replacement still have to be deducted. Your plant will have a different number.

Do I need a permit for a behind-the-meter battery?

Today, under the CNE provisions of April 16, 2026, a battery associated with your load facility does not require a storage permit, but adding it to an existing plant is treated as a technical modification of the connection, which involves a request for studies filed with CENACE and may require a study (sections 2.4 and 2.11.2); it cannot inject into the grid and its power counts within your contracted demand. If your plant already has solar panels interconnected as distributed generation, the provisions do not say expressly how the battery is registered: that has to be checked with CFE Distribución and CENACE before anything is proposed. The rules date from April 2026 and the procedure for medium-voltage plants is still being defined, which is why we review the filing on every project against the provisions in force.

Next step

Start with the bill, not the battery.

A BESS is sized from your demand profile, not from a catalog. With your 12 bills we tell you in writing whether your plant is a candidate and, if it is, we move on to the measurement and the proposal. If what suits you is more solar or correcting the power factor, that is what we will tell you.